How To Mix Concrete
for 350W, 350WSB and 350P Models

  •   You will need approximately 2-1/2 gallons water.
  •   Two 80 pound bags pre-mix concrete.
  •   Start mixer in motion.
  •   Put in 2 gallons of water.
  •   Add one 80 pound bag of pre-mix concrete
    NOTE: MIXTURE WILL BE VERY SLOPPY
  •   Slowly add 2nd bag of 80 pound pre-mix concrete.
  •   Add 1/2 gallon water slowly to obtain desired thickness.

How to Mix Sand & Gravel

  •   Use an 8-1/2 x 12" square point shovel.
  •   Portland cement, gravel or round stone and masonry sand.
  •   Start mixer in motion.
  •   Put in 2 gallons water.
  •   Add 6 shovels full of gravel or round stone.
  •   Add 2 shovels full of Portland cement.
  •   Slowly add 4 shovels full masonry sand
    NOTE: WATER WILL VARY ACCORDING TO MOISTURE CONTENT OF SAND & GRAVEL.

CONVERSION CHARTS

  •   Average maximum load = 200 lbs.
  •   2 cu. ft. = 6 sq. ft. 4" thick
  •   2 cu. ft. = 8 sq. ft. 3" thick
  •   1 yard = 27 cu. ft.
  •   1 yard = 80 sq. ft. 4" thick
  •   1 yard = 108 sq. ft. 3" thick
  •   1 80 lb. bag = 2/3 cu. ft.
  •   1 80 lb. bag per fence post

Volumes & Weights of Materials

  •   1 Bag of Cement = 88 lbs.
  •   1 Cu ft. Sand/Gravel = 85-100 lbs.
  •   1 Cu. ft. Plain Concrete = 140-150 lbs.
  •   1 Cu. ft. Water = 62-65 lbs.
  •   1 Gallon of Water = 8.33 lbs.
  •   1 Cu. Yard = 27 cu.ft.

Products available through www.concretetoolsupply.com